Slipstream / AetherCore / Cyclone
One weld.
Every decision traced.
Review the source documents. Link the material heat.
Record QC and NDE decisions. Assemble their evidence into a turnover package.
Weld registerSS-001
A04-WELD-REGISTER.pdf
Area 04 process upgrade
- Revision
- C
- Source page
- 4 of 8
- Weld rows
- 5
- Source ambiguity
- 1
SP-101 · ISO-A04-101 · 6 in · RT
WPS-O17WPS-017This fictional excerpt contains a deliberate letter O / zero ambiguity. Your correction is preserved alongside the original cells.
SS-MTR-004
MTR-FLANGE-58204.pdf
Revision 0 · page 2 · identity excerpt
6 in weld-neck flange · ASTM A105
H-582O4H-58204Follow the reviewed heat into W-042. Certificate identity review does not clear material QC or record delivery.
QC + NDE
QC-A04-58204.pdf
Material QC worksheet · revision 0 · page 1
RT-A04-W042.pdf
RT examination report · revision 0 · page 1
Purpose-made reports for the demo. Each decision preserves its reviewer, time, checks and rationale. No real inspection or engineering authorization is implied.
Follow the evidence
Four connected chapters in the actual sample workspaces.
Chapter 1 / Weld register
- 1Not started
Review in Slipstream
Resolve W-042’s procedure and review the five source rows.
- 2Waiting
Accept in AetherCore
Apply the reviewed handoff to one drawing reference and five welds.
- 3Waiting
Trace the construction record
Inspect W-042, its drawing and its original source row.
- 4Waiting
Search in Cyclone
Add the accepted document to the sample library and retrieve W-042.
Chapter 2 / Material certificate
- 1Waiting
Review the MTR
Confirm seven identity fields and correct heat H-582O4 to H-58204.
- 2Waiting
Accept the material
Create FLG-06-150 and its heat record. QC remains pending until the quality chapter.
- 3Waiting
Link the heat to W-042
Connect H-58204 to the same weld and drawing context.
- 4Waiting
Retrieve both sources
Find the weld register and reviewed MTR together in Cyclone.
Chapter 3 / Quality decisions
- 1Waiting
Approve material QC
Review the sample QC worksheet for H-58204 and record your rationale.
- 2Waiting
Accept the NDE report
Review W-042’s RT report and record its separate NDE decision.
- 3Waiting
Add decision evidence
Promote each report and decision snapshot to the sample library.
- 4Waiting
Retrieve both decisions
Inspect the QC and NDE results with their reviewers and source reports.
Chapter 4 / Turnover package
- 1Waiting
Review the sample drawing
Match ISO-A04-101 revision C to W-042 and spool SP-101.
- 2Waiting
Add the drawing evidence
Keep drawing identity review and Cyclone promotion separate.
- 3Waiting
Review five inclusions
Drawing, MTR, heat traceability, material QC and NDE.
- 4Waiting
Assemble the turnover package
Prepare a linked dossier and download the sample HTML or JSON manifest.
Your progress stays in this browser tab. You can leave, resume or restart the demo.
All actions stay in the browser. Document review, construction acceptance, quality decisions and knowledge indexing are separate steps. Receiving, weld completion and drawing release remain outside this demo.